Langley, BC V2Y0R4,24455 61 AVE #7
Langley, BC V2Y0R4,24455 61 AVE #7
Langley, BC V2Y0R4,24455 61 AVE #7
40
See all 40 photos
$2,300,000
Est. payment /mo
5 Beds
5 Baths
5,158 SqFt
Active

24455 61 AVE #7 Langley, BC V2Y0R4

REQUEST A TOUR If you would like to see this home without being there in person, select the "Virtual Tour" option and your agent will contact you to discuss available opportunities.
In-PersonVirtual Tour
Sat
6
Dec
Sun
7
Dec
Mon
8
Dec

UPDATED:

Key Details

Property Type Single Family Home

Sub Type Strata

Listing Status Active

Purchase Type For Sale

Square Footage 5,158 sqft

Price per Sqft $445

MLS® Listing ID R3021143

Style 2 Level

Bedrooms 5

Condo Fees $332/mo

Lot Size 8,727 Sqft

Acres 8727.0

Property Sub-Type Strata

Source Fraser Valley Real Estate Board

Property Description

Hyde Canyon, offering a lifestyle connected to nature, 5bed, 5bath home over 5,000 sqft on large lot, unobstructed views of the mountains and protected greenspace. Main floor w/ a den, formal dining, living and family w/ cozy fireplaces. Wide plank engineered hardwood throughout main level. Kitchen w/ quartz counters, deck located off the living area. Upper level you'll find the primary bed with a spa-like ensuite, private balcony, 3 additional bedrooms, including loft over the garage with private bath, offering flexibility for guests or workspace. Fully finished basement, 9ft ceilings, perfect for a home gym, a guest bedroom, huge rec room that would make an excellent theatre. Double garage, fenced backyard, hot tub, covered patio, scenic walking trails right outside your door. (id:24570)

Location

Province BC

Rooms

Kitchen 0.0

Interior

Heating Forced air,

Cooling Air Conditioned

Fireplaces Number 2

Exterior

Parking Features Yes

Community Features Pets Allowed, Rentals Allowed

View Y/N Yes

View Mountain view, View

Total Parking Spaces 4

Private Pool No

Building

Sewer Sanitary sewer, Storm sewer

Architectural Style 2 Level

Others

Ownership Strata

Virtual Tour https://www.cotala.com/82702


Powered by: REALTOR.ca
Listed by Royal LePage - Wolstencroft

GET MORE INFORMATION

Erin Sims

Erin Sims

+1(250) 299-3602

Agent | REALTOR® | License ID: 187014

Agent | REALTOR® License ID: 187014

Name

Phone*

Message